Aspire Fall 2008 Cover

FULL ISSUE

ASPIRE Fall 08 10.1 MB PDF FILE

FEATURES

AECOM—The Structure Behind The Structure 633.1 KB PDF FILE

How the AECOM bridge practice gets things built.

Maple Avenue Bridge 1.0 MB PDF FILE

Three cast-in-place arches with differrent shapes conform to Oregon canyon, adding beauty and functionality.

Folsom Lake Crossing 728.2 KB PDF FILE

Design and construction.

Canyon Park Freeway Station Bridge 846.9 KB PDF FILE

Precast concrete helps first bridge on interstate corridor meet state's context-sensitive design and speed construction.

Kanawha River Bridge 849.6 KB PDF FILE

A record segmental span.

Port Columbus International Airport 723.5 KB PDF FILE

Crossover Taxiway Bridge Creates new look.

DEPARTMENTS

Editorial 410.5 KB PDF FILE
Reader Response 402.9 KB PDF FILE
Concrete Calender 934.9 KB PDF FILE
Aesthetics Commentary 1.0 MB PDF FILE
Safety and Serviceability 433.7 KB PDF FILE
Concrete Connections 123.6 KB PDF FILE
AASHTO LRFD Specifications 72.2 KB PDF FILE